Friday, March 31, 2006

Camp One Front Wall

The PM crew went to work on Camp One today and got most of the front wall sheathed. Posted by Picasa

Camp One

The back wall of Camp One was finished at the end of class today. Robyn is used for the bottom row of nails. Posted by Picasa

Derek

Derek using one of his favorite tools, the cat's paw. Posted by Picasa

" Watch this Tim"

Shawn showing how to tie a knot. Posted by Picasa

Tim and Shawn

Running string to check walls for plumb and straight. Posted by Picasa

Mike

Mike sinking nails into the sheathing. Posted by Picasa

Camp One

 Posted by Picasa

Dan Building Canoe Boxes

Posted by Picasa

Mike

The sheathing on Camp One is going up! Posted by Picasa

Charlie and Tim

Good team work. Posted by Picasa

Ten by Ten

Build the door and shingle the roof, done. Posted by Picasa

Zach and Robyn

Zach and Robyn are bracing walls in Camp One. Posted by Picasa

Finishing Touches

The 10x10 is really looking nice and should be done in a few days. Two Man Crew is doing great. Posted by Picasa

Dan

Dan is building "canoe boxes" for Tanglewood camps. Posted by Picasa

Mike

Mike looking good in his new shirt. Posted by Picasa

John

John is installing shingles on the little house. Posted by Picasa

Charlie

 Posted by Picasa

Go Shawn!

 Posted by Picasa

Installing Window Unit

Ryan and Chris (inside building) are installing the window units that they built. Posted by Picasa

Shaun and Mollie

Shaun and Mollie taking another break. Posted by Picasa

Derek

A rare picture of Derek when he is not getting tnto trouble. Posted by Picasa

Shawn Cutting Blocking

 Posted by Picasa

Ryan

Ryan building a window unit. Posted by Picasa

Chris

Chris building a window unit. Posted by Picasa

Go Mollie!

 Posted by Picasa