Wednesday, January 30, 2008

 
Posted by Picasa

Zach

 
Posted by Picasa
 
Posted by Picasa

Randy and Allen

 
Posted by Picasa

Will and Ethan

 
Posted by Picasa
 
Posted by Picasa

Tyler and Tim

 
Posted by Picasa

Roof Rafters and the Hole for the Cupola

 
Posted by Picasa

Jacob and Zach

 
Posted by Picasa

Installing Batten Strips

 
Posted by Picasa

The Inside Story

 
Posted by Picasa

Allen and Randy

 

It is great to have Randy back in the program after being gone all first semester.
Posted by Picasa

Jon

 
Posted by Picasa
 
Posted by Picasa

Kenny Sheathing Roof of Cupola

 
Posted by Picasa

Tuesday, January 29, 2008

Ethan

 
Posted by Picasa

The Cupola

 

The Sugar House will need to vent off steam once they start to boil the sap. This structure will sit on top of the building and vent off all of the steam. We are building it on the ground because the building would be too tall to transport with it on top. It will be lifted in place at the job-site.
Posted by Picasa

Billy

 
Posted by Picasa

Hard Hat Zone

 
Posted by Picasa

Andrew on Board

 
Posted by Picasa

The Sunshine Boys

 
Posted by Picasa

Eric

 
Posted by Picasa

Jon Being Jon

 
Posted by Picasa
 
Posted by Picasa

Ben

 
Posted by Picasa